Lightweight
Negotiable Min Order Quantity Unit
- Required Quantity
-
- Place of Origin
- Payment Terms
- Negotiable
- Production method
- Negotiable
- Shipping / Lead Time
- Negotiable / Negotiable
- Keyword
- Category
- Other Minerals & Metallurgy Products
Aerotech Korea Co., Ltd.
- Country / Year Established
- South Korea /
- Business type
- Others
- Verified Certificate
-
16
Product name | Lightweight | Certification | - |
---|---|---|---|
Category | Other Minerals & Metallurgy Products | Ingredients | - |
Keyword | - | Unit Size | - |
Brand name | - | Unit Weigh | - |
origin | Stock | - | |
Supply type | - | HS code | - |
Product Information
- Strut clearance up to 1.00 metre
- Installation depth up to 3.9 meters
- Trench width up to 2.23 meters
The base plates are available in various lengths, from 2.00 meters up to 3.5
meters and various heights, form 1.6 meters up to 2.60 meters.
Beeper trenches can be shored using top boxes.
- Small to middle-sized trenches
- Supply lines
- Service lines
An all-rounder
4 different strut types make SBH lightweight shoring a real all-rounder in its
field. Depending on the job, trench widths between 65 centimeters and 2.23 meters
can be shored safely.
The SBH Light Weight Shoring is suited for small to middle sized trench construction and the usage of light construction machinery.
Light weight shoring is applicable variably and without problems, best suited for supply lines, house connections and cable laying.
Easily mounted struts, elastically located in the plate profile allow a quick assembly and easy installation with place and adjust method.
Installation depth up to: 3,00m
Trench width: 0,65 - 2,23m
Specificatioin
Year
|
Client
|
Construction CO.
|
Project Name
|
2006
|
Environmental Management Corporation (E.M.C) |
GS Construction Co. | Han-River Water System Sewer Pipe Maintenance Works 2nd Section of Works(Nan Yang Ju) |
2005
|
Pohang-si | GS Construction Co. | GuRyongPo Sewer Pipe Maintenance Works |
2005
|
Encironmental Management Corporation (E.M.C) |
GS Construction Co. | Han-River Water System Sewer Pipe Maintenance Works: 2nd Section(Nam Yang Ju) |
2004
|
Environmental Management Corporation (E.M.C) |
GS Construction Co. | Han-River Water System Sewer Pipe Maintenance Works: 2nd Section(Nam Yang Ju) |
B2B Trade
Price (FOB) | Negotiable | transportation | - |
---|---|---|---|
MOQ | Negotiable | Leadtime | Negotiable |
Payment Options | Negotiable | Shipping time | Negotiable |
- President
- JI SUNG WHAN
- Address
- 6thFl., Hanshin IT TowerII, Gasan-dong, Geumcheon-gu, Seoul, Korea
- Product Category
- Hand Tools,Other Minerals & Metallurgy Products
- No. of Total Employees
- 1-50
- Company introduction
-
Putting the top priority to safety and environment based on "the spirit of respecting human being" at the construction site of each area, Korea Aero Tech intends to lead the innovation of construction culture in all sectors such as developing, designing, producing, leasing, selling and constructing all products.
Especially, in the area of provisional facilities for blocking soil in the underground excavation work for underground pipe and underground structure, we save the budget of customer and each constructor by perfect safety control and prompt processing control through our products and construction method so that they can create maximum profit. Further, we satisfy our customers by constructing competitive products with excellent quality in defense facilities of rock crush and other safety facilities which use steel liner plate in the area of road facilities.We promise that we will realize brilliant growth through incessant challenge toward world with ceaseless R&D as well as domestically/globally competitive products and unlimited total service spirit.
- Main Product