Light Box
Negotiable Min Order Quantity Unit
- Required Quantity
-
- Place of Origin
- Payment Terms
- Negotiable
- Production method
- Negotiable
- Shipping / Lead Time
- Negotiable / Negotiable
- Keyword
- Category
- Other Minerals & Metallurgy Products
Aerotech Korea Co., Ltd.
- Country / Year Established
- South Korea /
- Business type
- Others
- Verified Certificate
-
16
Product name | Light Box | Certification | - |
---|---|---|---|
Category | Other Minerals & Metallurgy Products | Ingredients | - |
Keyword | - | Unit Size | - |
Brand name | - | Unit Weigh | - |
origin | Stock | - | |
Supply type | - | HS code | - |
Product Information
This shoring can be used in not stable ground conditions, too.
The flexible spindle is suited for the installation with cut and lower method.
The light box is mostly used for supply lines, house connections and able laying.
The robust construction of the side profiles allows higher strut clearances compared to the light weight shoring and the spindle we use with this type of shoring allows greater trench widths.
Installation depth up to : 4.00m
Trench with : 1.10 - 4.39m
Spindle clearance height : 1.30m
Specificatioin
Year
|
Client
|
Construction CO.
|
Project Name
|
2006
|
Andong-si | CheongLim Inc. Co. Bosung Construction Co. |
AnDong-Si Sewer Pipe Maintenance Works |
Korean Electronic Power Corporation |
KangNung Construction Co. | Busan Electronic Power Transmission Cable Laying Work | |
Daegu-si |
HanKuk Development Co. | DaeJang village Sewer Pipe Maintenance Works | |
Yeoju-si | YuJin Construction Co. | YeoJu MyungSeung Construction Site | |
Environmental Management Corporation (E.M.C) |
Daewoo Construction Co. | Han-River Water System Sewer Pipe Maintenance Works : 5nd Section(YongIn) |
|
GS Construction Co. | Han-River Water System Sewer Pipe Maintenance Works: 2nd Section(Nam Yang Ju) |
||
Busan-si | Lotte Construction Co. | GiJang Sewage Disposal Plant Pipe Works | |
TongYoung-su | DaeJeo Construction Co. | TongYoung-Si Sewer Pipe Maintenance Works : 1st Step. | |
2005 | Environmental Management Corporation (E.M.C) |
GS Construction Co. | Han-River Water System Sewer Pipe Maintenance Works: 2nd Section(NamYangJu) |
Kolon Construction Co. | Han-River Water System Sewer Pipe Maintenance Works: 3nd Section(Gapyeong) |
||
Samsung Engineering Co. | Han-River Water System Sewer Pipe Maintenance Works: 4nd Section (YeoJu,YangPyeong) |
||
Daewoo Construction Co. | Han-River Water System Sewer Pipe Maintenance Works: 5nd Section (GonJiAm / GwangJu / YongIn) |
||
Korea Development Co. | Han-River Water System Sewer Pipe Maintenance Works: 6nd Section(HaNam) |
||
2004 | Environmental Management Corporation (E.M.C) |
GS Construction Co. | Han-River Water System Sewer Pipe Maintenance Works: 2nd Section(NamYangJu) |
Kolon Construction Co. | Han-River Water System Sewer Pipe Maintenance Works: 3rd Section(Gapyeong) |
||
Samsung Engineering Co. | Han-River Water System Sewer Pipe Maintenance Works: 4th Section (YeoJu / YangPyeong) |
||
Daewoo Construction Co. | Han-River Water System Sewer Pipe Maintenance Works: 5th Section (GonJiAm / GwangJu / YongIn) |
||
Korea Development Co. | Han-River Water System Sewer Pipe Maintenance Works: 6th Section(HaNam) |
B2B Trade
Price (FOB) | Negotiable | transportation | - |
---|---|---|---|
MOQ | Negotiable | Leadtime | Negotiable |
Payment Options | Negotiable | Shipping time | Negotiable |
- President
- JI SUNG WHAN
- Address
- 6thFl., Hanshin IT TowerII, Gasan-dong, Geumcheon-gu, Seoul, Korea
- Product Category
- Hand Tools,Other Minerals & Metallurgy Products
- No. of Total Employees
- 1-50
- Company introduction
-
Putting the top priority to safety and environment based on "the spirit of respecting human being" at the construction site of each area, Korea Aero Tech intends to lead the innovation of construction culture in all sectors such as developing, designing, producing, leasing, selling and constructing all products.
Especially, in the area of provisional facilities for blocking soil in the underground excavation work for underground pipe and underground structure, we save the budget of customer and each constructor by perfect safety control and prompt processing control through our products and construction method so that they can create maximum profit. Further, we satisfy our customers by constructing competitive products with excellent quality in defense facilities of rock crush and other safety facilities which use steel liner plate in the area of road facilities.We promise that we will realize brilliant growth through incessant challenge toward world with ceaseless R&D as well as domestically/globally competitive products and unlimited total service spirit.
- Main Product
Related Products
Raw Wool
Wire Rope Forming Processing Work
belt cleaner conveyor belt cleaner primary PU cleaner
Electro Galvanized Wire
Anti loose self locking nut