earthquake prefabricated house
Negotiable Min Order Quantity Unit
- Required Quantity
-
- Place of Origin
- China
- Payment Terms
- Negotiable
- Production method
- Negotiable
- Shipping / Lead Time
- Negotiable / Negotiable
- Category
- Other Constructions
China Construction Fourth Engineering Installation Co.,Ltd
- Verified Certificate
-
9
Product name | earthquake prefabricated house | Certification | - |
---|---|---|---|
Category | Other Constructions | Ingredients | - |
Keyword | movable house , mobile home , high strength prefab house , earthquake prefabricated house | Unit Size | - |
Brand name | - | Unit Weigh | - |
origin | China | Stock | - |
Supply type | - | HS code | - |
Product Information
China State Construction Engineering Corp.,(CSCEC), prefab house, advantages:
1. With unique patent, fiber glass intergrated roof, and fiber glass beehive flooring technique. High strength, light weight. details composed, from raw material to each procedure.
2. Firm and strong, can be built on 8 storey
3. Rain water recycling use, for gardening, car washing etc.
4. Easy installation, disessemble, co-friendly.
5. Can be designed for customer requirement.
Standard size: 6055mm×2435mm×2896mm / 6055mm×2990mm×2896mm
Inside the house for delivery standard type:
Normal Five-hole socket 2 pcs, AC socket 1 pcs,
Lamp: double lamp 2 sets.,36W×2/piece,
Switch box, 1 pcs
Button switch: Single button switch 1 pcs
B2B Trade
Price (FOB) | Negotiable | transportation | - |
---|---|---|---|
MOQ | Negotiable | Leadtime | Negotiable |
Payment Options | Negotiable | Shipping time | Negotiable |
- President
- Mr. Zhang
- Address
- Guangzhou China
- Product Category
- Other Constructions
- Year Established
- 1958
- No. of Total Employees
- over 2000
- Company introduction
-
CCFED established in 1958, as a legal enterprise ownership of national general contract, construction, which was awarded " National Outstanding Construction Enterprise " in 2009, " National AAA Credit Enterprise " in 2010, " May 1 Labor Prize " in 2011, " Guizhou province Outstanding Construction Enterprise " in 2011, " Guizhou province Outstanding Construction Enterprise" for 10 years, and " The Cup of Safety & Health In China " competition winner enterprise from 2005 up to now.
In April 2013, for postitive respose new spirit of " National Documentation for Developing Green and Enviromental Protection, Convenient, Rapid Turnaround Newstyle Building Block", devoting great block desgin, auto-control, new model of factory production, Founding the CCFED Manufactory Standardized Facilities in Guangzhou, Guiyang city, meanwhile, introduction of high-tech equipment, improve technology in innovation, optimize production system, accomplished the factory module production in end of July through unremitting efforts and experiments, provided solid support for fast and steady, intelligent and efficient production.
Adhering the enterprise spirit " Intergrity, Innovation, Beyong, Win-win ". pursue the modern civilization, persisting in improving management and service, collaborating with the parties to the elite, developing the human happiness space!
- Factory Information
-
CCFED Standardized Manufacturing Facilities
- Main Product
Related Products
K-SPACE MASTER
SmileClouds Machine
Smart Shade (Model LS-A1)
Open Type Spring Mount (SMA)
3 LED White Module