Exhaust Gas Cleaning System (Marine Scrubber)
Marine SOx Scrubber for ship owners
Negotiable Min Order Quantity Unit
- Required Quantity
-
- Place of Origin
- South Korea
- Brand name
- MS-SOx Scrubber
- Payment Terms
- T/T
- Production method
- OEM
- Shipping / Lead Time
- 4 Month / Negotiable
Product name | Exhaust Gas Cleaning System (Marine Scrubber) | Certification | - |
---|---|---|---|
Category |
Other Machinery & Industry Equipment
Gas Disposal Other Environmental Products |
Material | CEMS (CONTINUOUS EMISSION MONITORING SYSTEM),MAIN CONTROL SYSTEM,SCRUBBER TOWER,WMS (WATER MONITORING SYSTEM) |
Keyword | egcs , exhaust gas cleaning system , sox scrubber , marine scrubber | Unit Size | 3000.0 * 4500.0 * 8000.0 mm |
Brand name | MS-SOx Scrubber | Unit Weigh | 40000 kg |
origin | South Korea | Stock | 50 |
Supply type | OEM | HS code | 842139901 |
Product Information
[Company Introduction]
GLOBAL ECHO has developed 'MS-SOx Scrubber', its own Exhaust Gas Cleaning System (EGCS), to provide solutions for the ship owners facing the most stringent sulphur emission standards of IMO.
'MS-SOx Scrubber' requires no dry-docking for retrofit which enables owners to enjoy vast savings from reduction of alteration and downtime of their ships. It's an economical and reliable solution for owners to achieve full-on compliance with SOx emission regulation.
[Technical features]
A. Proven system by global ship owners : Vitol Services(UK), Zodiac Maritime(UK), New Shipping(Greece), YASA(Turkey), HMM(Korea) and so on.
B. Exceptional benefits to the owner
-. Full turnkey provider (Scrubber system, engineering, installation, commissioning and seatrial by MS-SOx)
-. No dry dock required. Retrofit can be done at wharf (quay)
-. Max 2 weeks retrofit time. / Movie : https://youtu.be/ggY2G5JaBZ0
-. Lead time for parts and Class approval is only 4 months from order date. (Best record: 2.5 months)
-. No massive hull conversion or gross tonnage change
Comparison factor | MS-SOx(Global Echo) | Others | Remark |
Supply scope & guarantee | Mainly Full-turnkey Guarantee: Whole system(2 years) / Tower(5 years) | Mainly Scrubber system only Gurarantee: 1 year + @ |
|
Scrubber Tower(Material) | Titanium(Light & Corrosion free) | Stainless grade(Heavy & Corrosion risk) |
|
Scrubber Tower(Venturi) | Internal venturi(patented): Simple connection with less back pressure. No corrosion. | External venturi: High back pressure & Corrosion issue |
|
Delivery time & Class approval | 3 months | 5 - 12 months |
|
Installation place | Wharf, arranged by Global Echo | Drydocking | Full booking of drydocking can delay the project |
Installation time | 2 weeks | 6 - 8 weeks | Minimizes ship's off hire time |
Required seawater amount | 500m3/h (abt. 50% of others) | About 1,200m3/h | Based on Suezmax tanker, 2 pump running condition |
Power consumption of pump | 130kW (abt. 50% of others), Less OPEX | About 300kW, higher OPEX | |
Water flow control | Y-D start with constant speed operation. Familiar system to the ship's crew. Easy maintenance. Without VFD, power consumption is already 50% less. | VFD VFD malfunction leads to malfunction of the whole system. | Simplification of system. Less risk of malfunction. |
Discharge water pH value | pH 4.5 - 6.1 (more neutral) No risk of damage at ship side piece and hull coating | pH 2.5 - 3 (more acid) Damage at ship side piece and hull coating |
|
Sealing air fan | Not required. Patented non-air sealing type damper valve | Required. Continuous power consumption & maintenance |
|
Weight of system including pipe | About 40 ton | About 150 ton | Based on Suezmax tanker |
Gross tonnage change | No change | Increase |
|
Structure design at funnel area | Minimum change from original design | Massive change from original design |
|
Overboard pipe | Titanium sleeve inserting. Corrosion free | Coating application. Corrosion issue |
|
- Product Info Attached File
B2B Trade
Price (FOB) | Negotiable | transportation | Land Transportation,Ocean Shipping |
---|---|---|---|
MOQ | Negotiable | Leadtime | 4 Month |
Payment Options | T/T | Shipping time | Negotiable |
- President
- Minsu Seo
- Address
- 3F 135 Cheoyongsaneop 3 gil Cheongnyang eup, Ulju-gun, Ulsan, Korea
- Product Category
- Other Energy Related Products
- Year Established
- 2018
- No. of Total Employees
- 1-50
- Company introduction
-
[Company Introduction]
GLOBAL ECHO has developed 'MS-SOx Scrubber' its own Exhaust Gas Cleaning System (EGCS), to provide solutions for the ship owners facing the most stringent sulphur emission standards of IMO.
'MS-SOx Scrubber' required no dry-docking for retrofit which enables owners to enjoy vast savings from reduction of alteration adn downtime of their ships. It's an economical and reliable solution for owners to achieve full-on compliance with SOx emission regulation.
[Product - MS-SOx Scrubber]
A. Technical features
a) Proven system : Vitol Services(UK), Zodiac Maritime(UK), New Shipping(Greece), HMM(Korea) and so on.
b) Exceptioinal benefits to the owner
-. Full turnkey provider (Scrubber system, engineering, installation, commissioning and seatrial by MS-SOx)
-. No dry dock required. Retrofit can be done at wharf (quay)
-. Max 2 weeks retrofit time. / Movie : https://youtu.be/ggY2G5JaBZ0
-. Lead time for parts and Class approval is only 4 months from order date. (Best record: 2.5 months)
-. No massive hull conversion or gross tonnage change
B. Loan solution
-. 20% down payment at contract + 30% at work completion + 50% 5months instalment after work completion
-. NO loan commission is required. NO mortgage is required.
- Main Markets
-
Denmark
Germany
Greece
Hong Kong(China)
Japan
Singapore
South Korea
Taiwan
Turkey
U. Kingdom
- Main Product
Related Products
High Speed Door_ KAD-2000, cua cuon nhanh
UIM2901-5A MACH3 break out board for CNC
Airless Pump (Ratio 63:1 Airless Pump)
AIS3000 HD
NEMA17 42mm stepper motor with driver or controller