GOLDEN SCRAP GRAB GSG2 ~ GSG11
Negotiable Min Order Quantity Unit
- Required Quantity
-
- Place of Origin
- Brand name
- GSG SERIES
- Payment Terms
- Negotiable
- Production method
- Negotiable
- Shipping / Lead Time
- Negotiable / Negotiable
- Keyword
- grapple, orange grab, scrap grapple, scrap grab
GOLDEN BREAKER & CONSTRUCTION MACHINERY
- Verified Certificate
-
13
Product name | GOLDEN SCRAP GRAB GSG2 ~ GSG11 | Certification | - |
---|---|---|---|
Category |
Other Metal Scrap
Construction Machinery Parts Other Construction Machinery |
Ingredients | - |
Keyword | grapple , orange grab , scrap grapple , scrap grab | Unit Size | - |
Brand name | GSG SERIES | Unit Weigh | - |
origin | Stock | - | |
Supply type | - | HS code | - |
Product Information
GOLDEN SCRAP GRAB – GSG SERIES(GSG2~ GSG11)
1. PRODUCT FEATURE
▶ Strong structure & Weight minimization.
▶ All pin-holes in the heat-treated parts increase wear resistance bushing inserts the life of equipment .
▶ When the retractable legs spread when installing STOPBAR promote stablility in the Cylinder.
▶ Main frames are made by High wear resistance material (Hadox).
▶ Hydraulic 360° rotating system (Option - Fixed type).
▶ Mini Excavator and special puepose vehicles used to.
▶ Jaw Q'ty : four(4) Jaw - GSG2 ~ GSG11,
five(5) Jaw - Standard, GSG4 ~ GSG11,
six(6) Jaw - Option, GSG4 ~ GSG11.
▶ Application : Handling (iron scrap & waste paper)
2. SETTING PRESSURE GUIDANCE
▶ Piping Setting Pressure
- Close Pressure : 250 kg/㎠
- Open Pressure : 250 kg/㎠
▶ Rotator Pressure : 100 ~ 140 kg/㎠
▶ Motor Drain Piping Setting
- Setting : Rotator Pressure 140 kg/㎠
- Non Setting : Rotator Pressure 100 kg/㎠
3. STANDARD SPECIFICATION
MODEL WEIGHT CARRIER WEIGHT
GSG2 1 ~ 2.5 TONS EXCAVATOR
GSG3 2.5 ~ 3 TONS EXCAVATOR
GSG4 3 ~ 4 TONS EXCAVATOR
GSG5 4 ~ 5 TONS EXCAVATOR
GSG8 5 ~ 8 TONS EXCAVATOR
GSG11 8 ~ 11 TONS EXCAVATOR
B2B Trade
Price (FOB) | Negotiable | transportation | - |
---|---|---|---|
MOQ | Negotiable | Leadtime | Negotiable |
Payment Options | Negotiable | Shipping time | Negotiable |
- President
- DAVID OH (=CHANGHO OH)
- Address
- OFFICE 208, M TOWER BUILDING 8TH FLOOR, 3489 SEONGNAM-DONG, JUNGWON-GU, SEONGNAM-SI, GYEONNGGI-DO 462-827, SOUTH KOREA
- Product Category
- Other Construction Machinery,Other Hydraulics Tools,Other Machinery & Industry Equipment
- Year Established
- 2002
- No. of Total Employees
- 1-50
- Company introduction
-
EREH GROUP CI are pursuit of eco-friendly & creative environment of uban.
Total design group created by best designer and construction machinery are expressed meaning which jumps as the worldwide enterprise which advances with a future.Golden Breaker & construction Machinery are on of the EREH GROUP MEMBER and we have produce & export the construction attachment to the distributor/dealer in the world.
Main items are the excavator attachment and construciton machinery, material & spare parts.
- Main Markets
-
Chile
Colombia
Cuba
Israel
Kyrgyzstan
Mexico
Panama
Peru
Tadjikstan
U.S.A
Viet Nam
- Main Product
Related Products
CATERPILLAR EXCAVATOR SPARE PARTS
Aluminum Used Beverage Can
Bell B40D dump truck reconditioned dropbox
Spare parts for all concrete pumps
Hydraulic Breaker/Hammer Atlas Corpco spare parts