CB240 Climbing formwork
Negotiable Min Order Quantity Unit
- Required Quantity
-
- Place of Origin
- Brand name
- fwk
- Payment Terms
- Negotiable
- Production method
- Negotiable
- Shipping / Lead Time
- Negotiable / Negotiable
- Keyword
- climbing formwork
- Category
- Construction & Safety
CCCC INTERNATIONAL FWK FORMWORK CORPORATION
- Country / Year Established
- China /
- Business type
- Others
- Verified Certificate
-
11
Product name | CB240 Climbing formwork | Certification | - |
---|---|---|---|
Category | Construction & Safety | Ingredients | - |
Keyword | climbing formwork | Unit Size | - |
Brand name | fwk | Unit Weigh | - |
origin | Stock | - | |
Supply type | - | HS code | - |
Product Information
Recycling
Timber beam Formwork
Waterproof Formwork
Concrete Climbing Building Formwork with Adjustable Truss CB240B
CB240 climbing system is mainly used for concrete pouring in the wall, the core wall, the pier, etc. They guarantee simple handling, fast concreting cycles and problem-free adjustment to different wall configurations.
Competitive Advantage:
1. High bearing capacity
The high loading capacity of the brackets allow very large scaffold units. This saves the number anchor points required as well as reducing climbing times.
2.Simple moving procedure by crane
Through the strong connection of formwork together with the climbing scaffold, both can be moved as a single climbing unit by crane. Thus valuable time-savings can be achieved.
3. Fast striking process without a crane
With the retrusive set, large formwork elements can also be retracted quickly and a minimum of effort.
4. Safe with work platform
The platforms have assembled firmly with bracket and will be climbing together, without scaffolding but can work safely in spite of your high location.
5. Easy operation with truss supporting.
The formwork was supporting by truss unit that makes formwork operation easier by means of the platform form truss and same like adjustable brace, the truss also guarantees formwork’s exact verticality.
B2B Trade
Price (FOB) | Negotiable | transportation | - |
---|---|---|---|
MOQ | Negotiable | Leadtime | Negotiable |
Payment Options | Negotiable | Shipping time | Negotiable |
CCCC INTERNATIONAL FWK FORMWORK CORPORATION
- Country / Year Established
- China /
- Business type
- Others
-
11
- President
- Li Pan
- Address
- east economic development zone ,Cangzhou city, Hebei Province, China
- Product Category
- Home & Kitchen
- No. of Total Employees
- 51-100
- Main Markets
-
South Korea
- Main Product
Related Products
Bell B40D dump truck reconditioned dropbox
Wind and Solar Hybrid Street Light
Cummins engine parts
Spare parts for all concrete pumps
LED Camp Lantern/Mini Flashlight/Bike Light