AAC (Autoclaved aerated concrete) block production line
Negotiable Min Order Quantity Unit
- Required Quantity
-
- Place of Origin
- Brand name
- Huawei
- Payment Terms
- Negotiable
- Production method
- Negotiable
- Shipping / Lead Time
- Negotiable / Negotiable
Jiangsu Huawei Machinery Co.,Ltd.
- Country / Year Established
- China /
- Business type
- Others
- Verified Certificate
-
13
Product name | AAC (Autoclaved aerated concrete) block production line | Certification | - |
---|---|---|---|
Category | Construction Material Making Machinery | Ingredients | - |
Keyword | aac block machine , aac block plant , aac block machinery , autoclave aerated concrete block machine | Unit Size | - |
Brand name | Huawei | Unit Weigh | - |
origin | Stock | - | |
Supply type | - | HS code | 847141 |
Product Information
AAC (Autoclaved aerated concrete) block production line supplied by HUA WEI company, the capacities range from 160 – 300 m³/day. The choice for the investor of high duty production capacities.
Qualities of the AAC line:
for smaller markets (160 to 300 m³/day)
excellent product quality of the finished AAC
ideal choice for growing markets
green cake separating machine as an option
Steps of production:
Production Engineering:
1. First, dose and match measured raw materials
2. After distributing, feed raw material into pouring mixer to make slurry
3. Through thoroughly mixing, the slurry is poured into mould
4. After pre-curing with a certain temperature & time, the block would reach certain hardness prepare for cutting
5. Tilting hoister would turn over 90 degree of mould
6. Then open the mould & separate it from block, take the block with side plate with cutting cart
7. The block then be cut through the cutter firstly of two vertical sides of block
8. Secondly the horizontal cutting
9. Finally the vertical cutting
10. After cutting, the block is hanged to trolley with side plate by semi-finished product hoister
11. Organizing the cut blocks and put them into autoclave
12. Hardening the blocks under certain temperature and pressure
13. Take finished products out of autoclave
14. The finished product hoister takes the finished product to stock shield
15. Packed for loading
16. The side plate return back by side plate roller
17. Side plate would be organized with empty mould after demoulding
18. Clean up, oil spraying mould and preparing for next pouring
19. Steel bars processing for panel production
B2B Trade
Price (FOB) | Negotiable | transportation | - |
---|---|---|---|
MOQ | Negotiable | Leadtime | Negotiable |
Payment Options | Negotiable | Shipping time | Negotiable |
- President
- Manager
- Address
- No.363.Saineng Building,Jiyang Road(E),Zhangjiagang City,Jiangsu Province,China
- Product Category
- Construction Material Making Machinery
- Main Product